// Newsletter
BGE TECHNOLOGY NEWS 2022 Q2
Author(s): Thilo von Berlepsch, et al.
Second newsletter of BGE TECHNOLOGY GmbH in 2022
- Repository Research in Claystone – The ANSICHT-II Project
- Waste Container Design for the Dutch Disposal Concept in Rock Salt
- BGE and BGE TECHNOLOGY GmbH Intensify Their Cooperation with NUMO
- Start of another 5-YearContract for Technical Support to ONDRAF/NIRAS
- Design and Performance Assessment of Engineered Barrier Systems in a Salt Repository for HLW/SNF
Language: English
01.07.2022
// Annual Report
Annual Report 2021
BGE TECHNOLOGY GmbH's annual report for the year 2021
Language: English
01.06.2022
// Newsletter
BGE TECHNOLOGY NEWS 2022 Q1
Author(s): Philipp Herold, et al.
First newsletter of BGE TECHNOLOGY GmbH in 2022
- Repository Research in Crystalline Rock – The CHRISTA-II Project
- Rock-mechanical Analyses for the Konrad Repository – Stable Drift Support for Decades
- A New Approach to Using Existing Material Models in any Numerical Code without Implementation
- BGE TECHNOLOGY GmbH advances Norway’s Plans for High-level Radioactive Waste Disposal in Deep Boreholes
Language: English
01.04.2022
// Newsletter
BGE TECHNOLOGY NEWS 2021 Q4
Author(s): Wilhelm Bollingerfehr, et al.
Fourth newsletter of BGE TECHNOLOGY GmbH in 2021
- 4th Meeting of the Crystalline Club
- Molten Salts as Alternative Backfill and Sealing Materials for a Repository in Rock Salt
- The STROEFUN Project - Concreting of a Pilot Dam
- EDZ Evolution in Crystalline Rock and Development of Suitable Injection Techniques
Language: English
01.12.2021
// Newsletter
BGE TECHNOLOGY NEWS 2021 Q3
Author(s): Niklas Bertrams, et al.
Third newsletter of BGE TECHNOLOGY GmbH in 2021
- Shaft or Ramp?
- Consultancy on Deep Borehole Disposal of Radioactive Waste in Austral
- Support for BRIUG in Developing Their URF Program
- Fire Analysis – Shaft Asse 5
- Workshop for Site Selection Department of BGE mbH
Language: English
01.08.2021
// Newsletter
BGE TECHNOLOGY NEWS 2021 Q2
Author(s): Nina Müller-Hoeppe, et al.
Second newsletter of BGE TECHNOLOGY GmbH in 2021
- Drift Lining Systems for HLW Repositories in Claystone
- Successful Consolidation and Sealing of Backfill in the Asse II Mine
- Compaction of Crushed Salt for Safe Containment (R&D Project KOMPASS)
- Development of a Constitutive Model for Crystalline Rock
- Ensuring Backfill Material Quality at the Konrad Mine, Germany
Language: English
01.06.2021
// Video
Drift storage. Animation of the storage of a container in a drift
Author(s): Niklas Bertrams, David Seidel
Language: English
06.04.2021
// Newsletter
BGE TECHNOLOGY NEWS 2021 Q1
Author(s): Thilo von Berlepsch, et al.
First newsletter of BGE TECHNOLOGY GmbH in 2021
- Improving the Contact Zone of Geotechnical Barriers
- Drift Design and Support Load Determination for the KONRAD repository
- Development of Long-term Stable Backfilling and Sealing Materials
- Shaft 1 Renovation of HADES Undergound Research Laboratory
- Transport and Emplacement Technology
Language: English
01.04.2021
// Annual Report
Annual Report 2020
BGE TECHNOLOGY GmbH's annual report for the year 2020
Language: English
01.03.2021
// Newsletter
BGE TECHNOLOGY NEWS 2020 Q4
Author(s): Thilo von Berlepsch, et al.
Fourth newsletter of BGE TECHNOLOGY GmbH in 2020
- Successful Completion of the ELSA Phase 2 Project
- Support of International Deep Borehole Disposal Projects
- Certification Accomplished!
- Impact of Earthquake on Rock Bolts at Konrad Repository
Language: English
01.10.2020